The Irrigation and Water Resource Management Project (IWRMP) is financed by the World Bank (WB), the Government of Nepal (GON), and the involved Water User Associations (WUAs), and is being executed by Department of Irrigation (DOI).
Components of IWRMP
A – Rehabilitation and Modernization of Irrigation Infrastructure
B – Irrigation Management Transfer Reform
C – Institutional and Policy Support for Improved Water Management
D – Integrated Crop Water Management
Overall objectives of Component B
- To improve irrigation service performance and service delivery to selected irrigation systems in the Terai through the completion and consolidation of Irrigation Management Transfer (IMT) to the relevant Water Users Association (WUAs).
- To address problems exhibited in large public irrigation schemes (Agency Managed Irrigation Systems or AMIS) of below capacity performance, poor O&M, low cost recovery, and inadequate maintenance funds.
The original scope of project interventions envisioned working in 9 subsystems, but was later reduced to 4 subsystems as shown in Table E-A:
Table E-A: Component B Irrigation Systems/sub-systems Command Areas
Irrigation System |
Original Project |
Original Scope Revised Project |
No. of WUA |
||
Schemes/sub-systems |
Sub-Project Command Area |
Schemes/sub-systems |
Sub-Project Command Area |
||
Ongoing Work Sites (Original Scope) |
|
|
|
|
|
Kankai (KIS) (total system 7,000 ha) |
Entire System |
7,000 ha |
Entire System |
7,000 ha |
1 |
Sunsari Morang (SMIS) (total system 62,000 ha) |
Sitagunj SC Ramgunj SC Biratnagar SC |
8,000 ha 8,400 ha 5,000 ha |
Sitagunj SC
|
8,000 ha |
1 |
Narayani (NIS) (total system 37,000 ha) |
Blocks 2 & 8 Blocks 1, 3, & 9 Blocks 4, 5, & 6 |
6,000 ha 8,400 ha 6,000 ha |
Block 8 |
3,000 ha |
1 |
Mahakali (MIS) (total system 10,800 ha) |
Stage I Stage II |
4,800 ha 6,000 ha |
Stage I |
5,100 ha |
1 |
Active Sites Sub-Total |
9 Schemes |
61,000 ha |
4 Schemes |
23,100 ha |
4 |