SUB-PROJECT
1 1.1 Name of the project jhong putak
1.2 Category Surface
2 LOCATION   
2.1 Location  
VDCs/Municipality  
2.2 District/District headquarter Mustang/Jomsom
2.3 Province/ Development region Gandaki/Western
2.4 Physiographic division Mountain
2.5 Accessibility  
 a. Nearest Airport  
b. Nearest Road head  
2.6 Geographical Features  
 a. Latitude  28 49'57"
  b. Longitude  83 52'34"
2.7 Topographical Map No.  
2.8 Elevation  
2.9 Marking Facilities  
3 COMMAND AREA  
3.1 Gross Command area (ha) 45
3.2 Net command area 42
3.3 Soil(Suitability for rice )  
4 HYDROLOGY  
4.1 Hydrological region/Basin  
4.2 Name of source  Helku Khola
4.3 Type of source  
4.4 Measured discharge(Cumecs)  0.33
4.5 Catchment area  
4.6 Bed Material/River stage  
4.7 River course  
4.8 Water Right Problem  
5 CANAL  
5.1 Main canal length 4.2
5.2 Canal Side Slope  
5.3 Design discharge at Intake (lps ) 110
5.4 Idle canal length  .90
5.5 Lined Canal Length  
6 GEOLOGY  
6.1 Age of geological formation  
6.2 Geological formation  
6.3 Geology of diversion site  
6.4  Geology of canal alignment  
7 BENEFICIARIES  
7.1. Population 370
7.2 Household 53
7.3 Household size  
7.4 Food Situation  
8 CROPPING PATTERN  
8.1 Cropping Intensity ( Existing Cropping Pattern ) 94
8.2 Cropping Intensity ( Future Cropping Pattern ) 108
9 SCOPE OF WORKS  
9.1 Headworks Double Core Wall  
9.2 Canal Lining  
9.3 Cascade Drop  
9.4 VRB  
9.5 Division Box  
10 PROJECT COST  
10.1 Total Project Cost  
10.2 Project Construction Cost 19616
10.3 Cost per Ha  
10.4 Cost sharing by WUA Contribution 1636
11 ECONOMIC ANALYSIS  
11.1 EIRR (Normal) 22.66
11.2 B/C Ratio at 10% & 12% discount rate are 2.03
11.3 Benefit from project after irrigation  
11.4 Sensitivity Analysis reveals the followings  
11.4.1 Case I  
11.4.2 Case II  
11.4.3 Case III  
12 ENVIRONMENTAL SITUATION  
13 DEMAND FOR PROJECT  
14 RECOMMENDATION