SUB-PROJECT
1 1.1 Name of the project Gyandi ISP
1.2 Category Surface
2 LOCATION  Kushma-Na-13
2.1 Location  
VDCs/Municipality  
2.2 District/District headquarter parbat/Kushma
2.3 Province/ Development region Gandaki/Western
2.4 Physiographic division Hills
2.5 Accessibility  
 a. Nearest Airport  
b. Nearest Road head  
2.6 Geographical Features  
 a. Latitude  
  b. Longitude  
2.7 Topographical Map No.  
2.8 Elevation  
2.9 Marking Facilities  
3 COMMAND AREA  
3.1 Gross Command area (ha) 175
3.2 Net command area 170
3.3 Soil(Suitability for rice )  
4 HYDROLOGY  
4.1 Hydrological region/Basin  
4.2 Name of source  
4.3 Type of source  
4.4 Measured discharge(lps)  
4.5 Catchment area  
4.6 Bed Material/River stage  
4.7 River course  
4.8 Water Right Problem  
5 CANAL  
5.1 Main canal length 3.19
5.2 Canal Side Slope  
5.3 Design discharge at Intake (lps )  
5.4 Idle canal length 1.20
5.5 Lined Canal Length  
6 GEOLOGY  
6.1 Age of geological formation  
6.2 Geological formation  
6.3 Geology of diversion site  
6.4  Geology of canal alignment  
7 BENEFICIARIES  
7.1. Population 2400
7.2 Household 400
7.3 Household size  
7.4 Food Situation  
8 CROPPING PATTERN  
8.1 Cropping Intensity ( Existing Cropping Pattern ) 150
8.2 Cropping Intensity ( Future Cropping Pattern ) 155
9 SCOPE OF WORKS  
9.1 Headworks Double Core Wall  
9.2 Canal Lining  
9.3 Cascade Drop  
9.4 VRB  
9.5 Division Box  
10 PROJECT COST  
10.1 Total Project Cost  
10.2 Project Construction Cost 25075
10.3 Cost per Ha  
10.4 Cost sharing by WUA Contribution  
11 ECONOMIC ANALYSIS  
11.1 EIRR (Normal) 16.7
11.2 B/C Ratio at 10% & 12% discount rate are 1.39
11.3 Benefit from project after irrigation  
11.4 Sensitivity Analysis reveals the followings  
11.4.1 Case I  
11.4.2 Case II  
11.4.3 Case III  
12 ENVIRONMENTAL SITUATION  
13 DEMAND FOR PROJECT  
14 RECOMMENDATION